Posted by Bruce Borden in M/I Homes Culture

During a new construction home build, buyers typically receive weekly updates from their Construction Manager, along with milestone walkthroughs during framing, pre-drywall, and final orientation.

Building a new home is an exciting journey, but staying informed throughout the process is key to a stress-free experience. While daily progress on an active job site isn't always visible, a structured communication schedule ensures you always know what stage your home is in.

Whether you are navigating the initial steps to build a home or preparing for site excavation, here is what to expect regarding builder communication, update frequency, and key walkthrough milestones.

What Is the Typical Communication Schedule During Home Construction?

Most professional homebuilders follow a predictable communication cadence—often culminating in a weekly phone call or digital update. While your primary point of contact shifts depending on the construction phase, you can generally expect weekly progress reports alongside scheduled onsite meetings.

Build Phase Primary Contact Update Frequency What Is Communicated
Pre-Construction & Design New Home Consultant / Design Specialist Weekly / As Scheduled Finalizing floorplans, lot selection, design studio options, and municipal permit tracking.
Site Prep & Foundation Construction Manager Weekly (Phone / Email) Excavation progress, concrete pour dates, and initial construction timeline setup.
Framing & Mechanicals Construction Manager Weekly + Onsite Walkthrough Framing completion, roof trusses, HVAC/plumbing rough-ins, and Pre-Drywall Orientation.
Drywall & Interior Finishes Construction Manager Weekly (Photos / Portal Log) Drywall installation, cabinet fitting, countertop setting, tile work, and paint progress.
Final Steps & Closing Construction Manager / Lender Representative Bi-Weekly to Daily near close Closing Disclosure delivery (3-day rule), final punch-list items, and New Home Orientation.

Why Don't Homebuilders Send Daily Updates?

It is natural to want daily photos or check-ins when watching your dream home go up. However, weekly updates are the industry standard for a few important reasons:

  • Behind-the-Scenes Progress: Certain stages—such as pressure-testing underground plumbing lines, allowing concrete to cure (typically 28 days for full strength), or running electrical rough-in wiring—take several days without producing dramatic visual changes.
  • Inspection & Permit Scheduling: According to building benchmarks from the National Association of Home Builders (NAHB), job site activity often pauses for 24 to 48 hours while waiting for municipal inspectors to sign off on specific stages of home construction before trade crews can proceed.
  • Dedicated Focus on Construction: Giving Construction Managers dedicated blocks of time to supervise specialized trade crews, verify quality standards, and enforce site safety ensures your home is built right without constant administrative interruptions.

Key Walkthrough Milestones Where You Inspect Progress

In addition to weekly progress reports, you will meet directly with your build team at crucial structural junctures:

1. Pre-Construction Conference

Before dirt is moved, you will meet with your team to review site plans, structural options, and exact home placement on your specific homesite.

2. Pre-Drywall Orientation

Once framing, roofing, electrical, plumbing, and HVAC rough-ins are complete—but before insulation and drywall seal the walls—you will walk the open home with your Construction Manager to review outlet placements, option selections, and structural wiring.

3. New Home Orientation (Pre-Closing Walkthrough)

Approximately 5 to 7 days prior to closing, you will conduct a detailed walkthrough to learn how to operate your home’s HVAC system, main water shutoff valves, and electrical panels, as well as confirm that all cosmetic finishes meet quality standards.

How to Best Communicate With Your Builder

Establishing clear communication expectations early helps make your building process smooth and transparent. To get the most out of your updates:

  • Agree on Communication Channels: Let your team know early whether you prefer email summaries, phone calls, or digital portal updates.
  • Batch Non-Urgent Questions: Save general questions for your scheduled weekly call so your Construction Manager can address them all at once.
  • Follow Job Site Safety Rules: Under Occupational Safety and Health Administration (OSHA) guidelines, active construction sites contain hazardous conditions. Always schedule site visits in advance with your New Home Consultant or Construction Manager rather than visiting unannounced.

To see how construction updates fit into the broader roadmap of buying and closing on your new home, explore our complete guide to the new home construction process steps.

What Homeowners Say About Our Communication Process

From the time you visit our website to the moment you unpack your first box in your new home, we are committed to showing you a dedication that doesn’t stop. We hope you’ll walk away from your home purchase echoing what these homeowners have said:

“From the very moment I looked at the model to the final walk-through and purchase of the house, they provided step-by-step instructions and followed through on everything they said would happen. It was an easy process from beginning to end.” -Thomas, Chicago Homeowner

“My experience was very positive; the service was fantastic. The personnel were very responsive and helped to create a wonderful experience.” -Alison, San Antonio Homeowner

“This is my second home with this builder and I am very happy with it. The builder is fantastic and so is the customer service.” -Lionel, Raleigh Homeowner

Read what more happy homeowners have to say about their experience with us or contact us for information about our building practices and communities in your area.

Frequently Asked Questions About Homebuilding Communication

How often will my builder call or email me?

Most buyers receive formal progress updates once per week from their Construction Manager, alongside milestone meetings for pre-construction, pre-drywall, and final closing orientations.

What happens if bad weather or material delays slow down construction?

When unexpected factors like severe weather, supply chain shifts, or municipal inspection backlogs alter your estimated completion window, your Construction Manager will notify you during your regular weekly update to explain the adjusted timeline.

Can I visit the construction site whenever I want?

For safety and liability reasons, buyers must schedule job site visits with their building team in advance. Unannounced visits can disrupt active trade work and violate site safety regulations.



Author

Home
Bruce Borden

Author

Bruce has been with M/I Homes for over 20 years, has been the National Customer Experience Manager for over 10 years, and has been in the home building industry for over 30 years. Happily married and a proud father, Bruce enjoys outdoor activities and home improvement projects, and has never met someone he didn't like.

mature woman working from home

Your Guide to Buying a Home Out of State

Home Buying

Streetscape

Relocating to Chicagoland? Find the Perfect New Community for You

Local Guides and Resources